Ecology & Environment programme in Sikkim envisages
ecological restoration of fragile eco-system and the control &
abatement of air and water pollution in a scientific manner . The
main thrust is on integrating various development activities having
a bearing on the ecological balance and the potential resources of
the areas, through the biological and light engineering measures with
a multidisciplinary approach. The rapid urbanisation and the increasing
population of the locality has been causing a threat to the ambient
air & Water quality of these towns. As such, regular monitoring
of pollution parameters is must to minimise them effectively in the
successive years. Eco-Development programmes has been concentrated
in urban areas and a eco-park for recreational purpose.
SIZE OF THE PLAN:
Financial : Rs 30.00 lakhs
1. DIRECTION & ADMINISTRATION
Annual Plan 2002-2003: Rs 16.50 lakhs
A provision of Rs 16.50 lakhs has been projected
under Direction & Administration to meet up the probable expenditure
on account of establishment viz. Salaries, Travelling Allowances Motor
Vehicle and Office expenses including the purchase of computer set
etc. in Environment Pollution Control Division.
2. WET LAND CONSERVATION
Annual Plan 2002-2003: Rs 4.50 lakhs
The Wet Land areas in the form of lake and other
beings. In view of the ecological and environmental importance of
the region, efforts has been made towards the implementation of conservation
measures of this areas by providing necessary protection. Suitable
silviculture treatment and supplementing the stock by artificial regeneration.
The salvation of lake in high altitude areas is the primary objective
to keep such water bodies in its original shape and sizes. For this
purpose, silt detention structure is required to be constructed all
around the lake so that the silt is checked from going down into the
lake. The cleaning and removing of the siltation from the lakes is
the next operation to execute salvation work manually. There are number
of lake in Sikkim, out of which, 150 numbers have been identified
so far. The programme shall be implemented all over the areas under
North, South, West and East District.
3. TREATMENT OF CATCHMENT AREAS OF URBAN DRINKING
WATER SUPPLY
Annual Plan 2002-2003: Rs 3.50 lakhs
This scheme aims at the restoration of degraded catchment
areas of water sources for supply of drinking water to the urban areas.
Rateychu forms the major water source for supply of drinking water
to Gangtok and the neighbouring areas. Apart from this, other catchment
areas of water sources located in South, West and North District have
been proposed to be taken up during this plan period.
4. ECO-DEVELOPMENT OF URBAN AREAS
Annual Plan 2002-2003: Rs 1.00 lakhs
This is a programme proposed to be carried out in
urban townships and other such areas for creation of green belt with
an object to provide sink for CO2, city-noise and also to provide
aesthetic beauty of the surroundings. The programme includes the landscaping
beautification, plantation of ornamental plants and pollution tolerant
species, creation of Eco-Park etc. which will be undertaken as per
the site condition.
5. J.N. BOTANICAL GARDEN AT RUMTEK
Annual Plan 2002-2003: Rs 1.50 lakhs
This programme consists of propagation and ex-situ
conservation of several varieties of Orchids. Rhododendrons and associate
plants with an aim to educate the people about the richness of the
floral wealth of the Eastern Himalayas. This garden has also become
a tourist spot. The proposed developmental activities includes extension
of garden, renovation of existing glass houses, landscaping, turfing,
construction of bridle path, toiletries, resting sheds, compound fencing
and purchase of tools & equipments etc. required for upkeep of
the garden.
6. PREVENTION OF AIR & WATER POLLUTION
Annual Plan 2002-2003: Rs 3.00 lakhs
This scheme envisages regular monitoring of pollution
of ambient air & water (both potable as well the water eco-system)
in order to enforce the laws relating to the Pollution Control. The
proposed activities are monitoring of lake & river system, monitoring
of air & water quality of townships and industrial discharges,
up-gradation of laboratory, purchase of chemical & glasswares,
purchase of new set of computer with dot-matrix printer for processing
of data and regular publication of reports & journals etc.
ABSTRACT
Sector: Ecology And Environment
|
Sl.
No
|
Name of Scheme
|
10th Five Year Plan
|
Annual Plan 2002-2003
|
Remarks
|
|
Physical
|
Financial
|
Physical
|
Financial
|
|
Cubic
|
Area in
|
Rupees
|
Cubic
|
Area
|
Rupees
|
|
1.
|
Direction & Administration
|
-
|
-
|
90.00
|
-
|
-
|
16.50
|
|
|
2.
|
Environmental Education Training & Extension
|
-
|
-
|
10.00
|
-
|
-
|
-
|
|
|
3.
|
Wetland Conservation
|
638
|
244
|
83.00
|
-
|
-
|
4.50
|
|
|
4.
|
Treatment Catchment Areas of Urban Drinking Water Supply
|
508
|
127
|
66.00
|
-
|
-
|
3.50
|
|
|
5.
|
Ecological Stability of Hill Slopes
|
230
|
30
|
23.00
|
-
|
-
|
-
|
|
|
6.
|
Treatment of Catchment Area of Rural Irrigation Programme
|
192
|
48
|
25.00
|
-
|
-
|
-
|
|
|
7.
|
Eco Development of Urban Area
|
-
|
18
|
50.00
|
-
|
-
|
1.00
|
|
|
8.
|
Jawaharlal Nehru Botanical Garden at Rumtek
|
-
|
-
|
74.00
|
-
|
-
|
1.50
|
|
|
9.
|
Germ Plasm Bank
|
-
|
-
|
10.00
|
-
|
-
|
|
|
|
10.
|
Preservation of Air Water and Pollution
|
-
|
-
|
69.00
|
-
|
-
|
3.00
|
|
| |
TOTAL
|
1568
|
467
|
500.00
|
-
|
-
|
30.00
|
|
|
-